MOMA PS1 WARMUP 2006 BEATFUSE!
PS1 CONTEMPORARY ART CENTER
New York
June 2006
|
CREDITS
OBRA Architects Site Assembly, Terry Chance, fabrication contractor Sciame, Jim Kilkenny, Marco Alvarez, Scott Jones, construction manager Island Acoustics, Stephen J. Kistulinec, installation Robert Silman Associates PC, Nat Oppenheimer, Pat Arnett, structural engineering Transsolar Energietechnik GmbH, David White, environmental engineering Tillett Lighting Design, Linnaea Tillett, Stephen Horner, Yeune Kyue Kim, lighting design Dr. Gerald Palevsky PE, pool consultant Omnivore, Alice Chung, Karen Hsu, t-shirt and truck graphic design iLevel by Weyerhaeuser, Timberstrand and plywood Shaw Stewart Lumber, CNC routing Solors Optional Axis, CNC routing Maloya Laser Inc., metal lasercutting and fabrication Caliper Studio, metal fabrication Delstar Technologies Inc., polyethylene mesh West System Inc., epoxy products Owens Corning, rigid foam insulation Four Corners CNC Services, CNC routing DD Wire Company, light strainer fabrication Atomizing Systems Inc., misters Targetti North America, lighting Radiant GUARD, foil insulation
Support for this project has been generously provided by: |